Middleton Engineering provide both recycling sorting equipment and complete turnkey solutions for Material Recovery Facilities (MRFs).
Middleton Engineering and its partners can also provide purpose built buildings to house your recycling sorting equipment.
Our technical department are able to provide a design layout in order to optimise your business. Alongside maximising space, you will also be able to ensure that your recycling sorting equipment and material recovery facility is both efficiently run and safe.
- Storage Bays
- Walking Floors
- Conveyors (in floor/above floor)
- Eddy Current Separators
- Picking Stations
- Optical Sort
- Overband Magnets
- Bottle Perforators
- British Designed and Built Baling Presses
- Storage Bays
- Walking Floors
- Conveyors (in floor/above floor)
- Eddy Current Separators
- Picking Stations
- Optical Sort
- Overband Magnets
- Bottle Perforators
- British Designed and Built Baling Presses
Recent Installations
Middleton Engineering took responsibility of both the design and installation of a Material Recovery Facility for Merthyr Tydfil County Borough Council. The recycling sorting equipment was commissioned for the purpose of handling 5,000 tonnes of recyclate per year.
Guarded Personnel Walkways
Sorting System and Storage Bays
Storage Bay
Self Combing Bottle Perforator
Automated Sorting Line
Non Ferrous Conveyor with Overband Magnet and Picking Station
Eddy Current Separator with Picking station
Overband Magnet
Waste Storage Bays and Pit Conveyor
Manual Picking Line
Baler Used in Recycling System
Building Extension for External Storage Bays
The solution included a new building extension with civil works, in order to house in floor sections of the sorting system. As well as an infeed conveying line and external storage bays, there was also an elevated picking station (complete with TV monitoring and variable belt speed control) installed. Additionally, an Overband Magnet and an Eddy Current Separator were also provided.
The remaining plastic in the waste stream is then fed through a Middleton Engineering Bottle Perforator. Finally, Storage bays were also provided for the collection of sorted materials, prior to them being processed by a Fully Automatic Scapa Middleton ME2R80 Twin Ram Baler with infeed conveyor. Since the installation of the MRF in 2015, recycling in Methryr Tydfil was up a huge 25% in just a year.